Event #:  4738
Q1:  1. How many samples will be needed for each part for testing?
2. Typically, there is a cost associated with sample lots. How would Electrolux prefer these charges to be handled?
3. A 30 day lead time for samples is extremely aggressive, typically this takes anywhere from 60-75 days. Will there be any flexibility? If the 30 day lead time is required, this may also result in higher costs which we would like to avoid.
A:1. This will vary by part, however please consider up to one weeks production (based on total annual quantity) to cover all requirements for manufacturing line trials, PPAP, and testing.
2. This is not easily defined until we know what will be needed for testing so this subject is to be reviewed and discussed with low bidders after the bid.
3. There is flexibility in this, however we will evaluate awards based on quality, cost, delivery, etc.